Curtain in PIERRE Partner application

Updated: 31 Oct 2024
Description

The Curtains feature in the PIERRE Partner app allows users to automate and control curtains seamlessly within their smart home system. This feature ensures smooth management of curtain movement and integrates well with other devices for a fully automated home experience.

Key Features:

1. Adding Curtains:

  • To add a curtain, select the appropriate Controller, navigate to the Outputs tab, and choose Curtain as the type. Fill in details like Name, Role, Group, and upload photos for both Open and Closed states. Enter the Identifier, which links the I/O in the electrical project. You can enable or disable the Hide Activity option to hide the curtain's activity from the Activity tab. Select the Open and Close directions and, if necessary, add a new button for opening and closing the curtain.

2. Editing Curtains:

  • To edit a curtain, go to the Outputs tab within the Controller where the curtain was added, select the curtain from the list, and edit the required fields. You can modify details like Name, Role, Group, photos for Open and Closed states, Identifier, and the Open and Close directions. Additionally, you can add a new button for controlling these functions.

3. Automated Scenarios:

  • Curtains can be included in automated scenarios to enhance convenience and control. For instance, the "Good Morning" scenario can automate curtains to open every weekday at 8 AM and on weekends at 9 AM. This simultaneous activation of multiple smart devices provides a more synchronized and automated home experience.

4. Seamless Integration:

  • Curtains integrate seamlessly with other devices in the PIERRE smart home system. This allows for synchronized actions, such as linking curtains with lighting or environmental sensors to adjust automatically based on time of day or light levels, enhancing both convenience and energy efficiency.

The Curtains feature in the PIERRE Partner app offers users a powerful, flexible way to manage curtains, ensuring ease of use and automation capabilities that improve daily life.

Steps
Title
Add Curtain
Description

Curtain can be added in a few steps.

Screenshot items
Image
Choose Controller
Choose Controller

Tap on the Controller that you would like to add new I/O to.

To edit the I/O, click on the Controller to which the I/O is added.

Image
Outputs - Add button
Outputs - Add button

Tap on the Outputs at the top and tap on the button Add.

Image
Choose type in Partner application
Choose type in Partner application

Choose type - From the list choose the device that you would like to add. 

Scroll to the desired I/O from the list that you would like to add and tap on it.

Image
New Curtain
New Curtain

Fill the following form:

  • Name - Write the name of the Curtain.
  • Role - Choose role from the list.
  • Group - Choose group from the list.
    Group is a group of I/O and scenarios that seems most logical to you.
  • Photo - Choose photo for the Curtain - Closed, Open.
  • Slide to confirm - When it is enabled you will be asked to confirm the desired operation to avoid accidental actions.
  • Identifier - This field is the identifier of the I/O in the electrical project.
  • Hide Activity - This field is used for hiding I/O activity from the Activity tab.
  • Open Direction
    Output - Choose Pin.  Pin is physical place on the Controller where I/O is connected to it.
    To confirm choice tap on button Done.
    Timeout - Choose timeout. Time in seconds which is needed for the Curtain to open completely.
    When you are satisfied with your choice tap button Save.
  • Close Direction
    Output - Choose Pin. Pin is physical place on the Controller where I/O is connected to it.
    To confirm choice tap on button Done.
    Timeout - Choose timeout. Time in seconds which is needed for the Curtain to go down completely.
    When you are satisfied with your choice tap on the button Save.
    Time in seconds which is needed for the Curtain to open completely. 
  • Button Open
    Add a new Button - Choose Button.
    Tap on the desired button from the list.
    When you are satisfied with your choice tap on the button Done.
  • Button Close
    Add a new Button - Choose Button.
    Tap on the desired button from the list.
    When you are satisfied with your choice tap on the button Done.
  • Open Direction
    Left
    Right
    For more details follow next steps.
    When you want to confirm your choice tap on buttons Save and Submit.
Image
Select Roles
Select Roles

You can select desired Role or Roles - multiple choice if you tap on the checkboxes next to them.

Tap on Save/Done.

Image
Select Groups
Select Groups

In this step, you need to select one or more Groups

Select the checkbox/checkboxes next to the Group/Groups that you want to associate with the I/O.

Once selected, the I/O will appear in the chosen Groups on the Dashboard.

Tap Save/Done to confirm your selection.

Image
Change photo - Curtain in PIERRE Partner application
Change photo - Curtain in PIERRE Partner application

Tap photo of the Curtain.

You have three options:

  • Open Library - The phone’s Library will open. It is recommended to take pictures from the same angle for both Curtain statuses to achieve a complete and consistent view.
  • Open Camera - You can take a picture using your smartphone. For a complete and consistent view, it’s recommended to capture both Curtain statuses from the same angle.
  • Choose default image - These images are prepared in advance in order  to provide a complete and seamless experience.
Image
Open/Close Direction
Open/Close Direction

Tap in the fields:

  • Output - Choose Pin and confirm by click on button Done.
  • Timeout - Choose timeout and click button Save.

For more details follow next steps.

Image
Open/Close Direction - Choose Pin
Open/Close Direction - Choose Pin

In this step you should for Open/Close Direction click in the field Output and Choose Pin by selecting radio button next to it.

To confirm choice tap the button Save.

Image
Choose Timeout - Curtain
Choose Timeout - Curtain

In order to set hours, minutes and seconds - Timeout, you should scroll through each of these columns and when you are satisfied with your choice tap Save button.

Image
Button Open/Button Close
Button Open/Button Close

Tap on Add a new Button.

Image
Choose Button
Choose Button

In this step you should choose add button for the Button up/Button down.

Tap on the Add new Button and Choose Button.

Tap on the desired button from the list.

To confirm tap button Done.

Image
Button - Pressed, Held, Double Pressed
Button - Pressed, Held, Double Pressed

Curtain will open/close when button is Pressed, Held, Double pressed.

In this case Curtain will open when the button is Pressed.

To confirm your choice tap button Save.

Title
Edit Curtain
Description

Edit Curtain in few following steps.

Screenshot items
Image
Choose Controller
Choose Controller

Tap on the Controller that you would like to add new I/O to.

To edit the I/O, click on the Controller to which the I/O is added.

Image
Outputs - Choose I/O
Outputs - Choose I/O

Tap on the Outputs tab, scroll to the desired I/O from the list and tap on it.

Image
Edit Curtain
Edit Curtain

Edit following form:

  • Name - Edit the name of the Curtain.
  • Role - Choose role from the list.
  • Group - Choose group from the list.
    Group is a group of I/O and scenarios that seems most logical to you.
  • Photo - Choose photo for the Curtain - Closed, Open.
  • Slide to confirm - When it is enabled you will be asked to confirm the desired operation to avoid accidental actions.
  • Identifier - This field is the identifier of the I/O in the electrical project.
  • Hide Activity - This field is used for hiding I/O activity from the Activity tab.
  • Open Direction
    Output - Choose Pin. Pin is physical place on the Controller where I/O is connected to it.
    To confirm choice tap on button Done.
    Timeout - Choose timeout. Time in seconds which is needed for the Curtain to open completely.
    When you are satisfied with your choice tap button Save.
  • Close Direction
    Output - Choose Pin. Pin is physical place on the Controller where I/O is connected to it.
    To confirm choice tap on button Done.
    Timeout - Choose timeout. Time in seconds which is needed for the Curtain to go down completely.
    When you are satisfied with your choice tap on the button Save.
    Time in seconds which is needed for the Curtain to open completely. 
  • Button Open
    Add a new Button - Choose Button.
    Tap on the desired button from the list.
    When you are satisfied with your choice tap on the button Done.
  • Button Close
    Add a new Button - Choose Button.
    Tap on the desired button from the list.
    When you are satisfied with your choice tap on the button Done.
  • Open Direction
    Left
    Right
    For more details follow next steps.
  • When you want to confirm your choice click on buttons Save and Submit or when you want to delete Curtain tap button Delete.
  • For more steps follow link: https://wiki.smartpierre.com/pierre-partner-application/outputs/curtain-pierre-partner-application#step-screenshot_item-139
Is there something missing?
Give feedback for this page
Back to Top